Return to the Electrical Wiring Forum | Post a Follow-Up

 o
Remodel work?

Posted by footwedge (My Page) on
Wed, May 18, 11 at 9:07

I need to move the switch for the garbage disposal and add receptacles to include the dishwasher. There is not enough slack to use the existing lead ins; and, was wondering if it's ok to cut the lead ins adding a jb in the attic then add the required length of cable in lieu of running all new cable to the panel box? Also, is it common practice to do this regardless of the 120v circuit involved when this simplifies the installation?

TIA


Follow-Up Postings:

 o
RE: Remodel work?

As long as the new junction box remains accessible you should be fine (note some new rules about burying boxes under insulation have been put in place).


 o
RE: Remodel work?

Thanks Brickeyee.

Another question for you. Are the knock out tabs on remodel boxes supposed to removed or just bent inward? I'm hoping for the just bent inward because these are a royal pain to completely remove.


 o
RE: Remodel work?

Which new rules are those Brick? Some change in 2011 I missed?

Which tabs are we talking about? Knockouts get removed completely. If you're talking about the clips on the plastic boxes that are where you stuff the NM (romex) cable, then they just get pushed inward (so they bind on the cable so that it can't be (easily) pulled out).


 o
RE: Remodel work?

On the new work plastic boxes (usually nail to studs), you knock out the, uh, knockouts. The cable is to be secured within, oh, now I forget - 3" of the box? Or is it 6"? Someone set me straight here, I don't have the book here, and always just secure it as close to the box as practical.

On the old work boxes (usually have wings to hold them in plaster or drywall), they're cable clamps as Ron describes. You push the cable through and (assuming the plastic isn't junk) it will hold the cable. Clamps are required where the cable is fished to the box without being secured to the stud inside the wall.


 o
RE: Remodel work?

David, there are plenty of new-work plastic boxes that do not have KO's and are just like Ron described.

Pretty much the only ones like you describe are brown/tan bakelite boxes and some blue boxes.


 o
RE: Remodel work?

If the backsplash will be tiled, do you install the remodel boxes before or after the tile? I'm thinking before, to inure the tabs have the most contact with the rock.

Since the remodel boxes are flush with the face of the rock, will there be a need for any adjustments to the switches/outlets to make sure everything is flush at the end? If spacers are needed, what is the recommended model?


 o
RE: Remodel work?

Depends on the design of the box, but usually you have to put them in AFTER the finished surface. The problem is that you need to get the front of the box within an 1/4" of the finished surface. Depending on the thickness of your tile, installing them flush with the underlying wallboard may not put them far enough out.


 o
RE: Remodel work?

Ronnatalie, the box design has 2 tabs each on the top and bottom. These tabs are pulled against the rock with screw flanges. Also, these tabs are the meat of the installation. If they don't have adequate contact the box will be unstable. I have not see any other types at the big box stores.

If I install them prior to the tile, then I will have to make sure the tile guy lays to tile to very closely fit the box size so the tabs will have a contact surface. These tabs only extend about 1/4 inch above and below the box- not much to play with. I don't think the tile guy be be this precise.

I think I might have to make some spacers to put behind the tabs if needed.


 o
RE: Remodel work?

"Which new rules are those Brick? Some change in 2011 I missed?"

Might be 08.

I recall the addition of a specific call out that boxes in attics may not be buried in insulation.

It might be in the form of a change in the finished surface definition.


 o
RE: Remodel work?

If the back splash is gonna be tiled then while doing the surface prep I would make a large enough hole to be able to install new work boxes and bring them out to where they should be. It shouldn't be much of a problem to repair or patch the hole. Up in the attic just use new work boxes and install high enough on a brace to be above any insulation, then no matter what code says about burying or not, you are covered, uh make that uncovered. Then seal it with a blank plate.


 o
RE: Remodel work?

I'd like the reference to the insulation if you can find it. I searched around in the 2011 book and couldn't find anything.


 o Post a Follow-Up

Please Note: Only registered members are able to post messages to this forum.

    If you are a member, please log in.

    If you aren't yet a member, join now!


Return to the Electrical Wiring Forum

Information about Posting

  • You must be logged in to post a message. Once you are logged in, a posting window will appear at the bottom of the messages. If you are not a member, please register for an account.
  • Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review your post, make changes and upload photos.
  • After posting your message, you may need to refresh the forum page in order to see it.
  • Before posting copyrighted material, please read about Copyright and Fair Use.
  • We have a strict no-advertising policy!
  • If you would like to practice posting or uploading photos, please visit our Test forum.
  • If you need assistance, please Contact Us and we will be happy to help.


Learn more about in-text links on this page here