BEst practice

Posted by drwalt (My Page) on
Fri, Mar 2, 12 at 9:24

I presently have an outbuilding subpanel connected to a main service panel with #10 copper 2+G backfeeding a 30A breaker, w branch circuits - the G wire serves as neutral. The sub panel neutral buss is tied to a ground rod because there is no other metalic connector between the two buildings. This has worked well so far. Now I want to run a 100 Amp #2 aluminium wire to a new subpanel in the same outbuilding, from the same service panel. The aluminum wie is direct burial, 2-2-4, no ground. Here are my questions. Assuming the main service panel is properly grounded to two ground rods with #6 copper:
1) should I disconnect the present 30 Amp service and rewire the existing subpanel to a 30 Amp breaker in the New Panel?
2) should I connect the new panel to the existing ground rods on the existing 30 Amp subpanel , or would it be better to use the #10 wire to run the ground back to the main service panel?
3) presently the neutral and ground wires in the main service panel are on the same buss, this is also true in the existing 30 subpanel in the outbuilding. Should the subpanel neutrals and grounds be on separate busses or tied together?
Thanks, drwalt


Follow-Up Postings:

 o
RE: BEst practice

What version of the NEC are you under?

Around 2008 the 3-wire feed exception was removed, and a 4-wire feed is not required.


 o
RE: BEst practice

I don't know, where would I find out? What are the implications for my situation?


 o
RE: BEst practice2

House was built in 1989, so I assume pre2008NEC.


 o
RE: BEst practice

But when you are modifying or adding to the electrical system, you have to conform to whatever code is currently being used in your area.

Brickeyee, did you mean "a 4-wire feed IS required"?


 o
RE: BEst practice

"I don't know, where would I find out? What are the implications for my situation?"

Whoever is responsible for inspections (city, county etc) in your area will gladly tell you what edition of the NEC has been adopted.

Depending on the department, the inspectors might be willing to answer specific questions directly.


 o
RE: BEst practice

Doesn't matter when the house was built. Your new work will need to correspond to the current code. If you tell us where you are, we can probably make a good guess as to NEC version (unless you're in CT, MO, HI, Reno, or Tuscon, it's probably a safe bet you're on 2008 or later).

As pointed out, the old code had an exemption to not run an equipment grounding conductor between buildings when there were no other metallic paths between the building. Your current 30A wiring appears to not be legal under any version of the code. You can't just use the ground wire in the cable for the required grounded (neutral) conductor.

I'd run the grounding conductor, it was always a good idea even under the old code.


 o Post a Follow-Up

Please Note: Only registered members are able to post messages to this forum.

    If you are a member, please log in.

    If you aren't yet a member, join now!


Return to the Electrical Wiring Forum

Information about Posting

  • You must be logged in to post a message. Once you are logged in, a posting window will appear at the bottom of the messages. If you are not a member, please register for an account.
  • Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review your post, make changes and upload photos.
  • After posting your message, you may need to refresh the forum page in order to see it.
  • Before posting copyrighted material, please read about Copyright and Fair Use.
  • We have a strict no-advertising policy!
  • If you would like to practice posting or uploading photos, please visit our Test forum.
  • If you need assistance, please Contact Us and we will be happy to help.


Learn more about in-text links on this page here