Return to the Home Repair Forum | Post a Follow-Up

 o
pouring concrete walkway

Posted by victor17 (My Page) on
Sun, Jul 11, 10 at 17:42

I am trying to pour a concrete walkway around my pool. The problem is there is a 6" concrete boarder that is 4" below the leveal of the pool. I want to pour the walkway over the 6" concrete and extend it 3 feet wide onto dirt. Can I use rebar to do this or am I not able to pour part on concrete and part on dirt. Is there any way I can get this done without it cracking?


Follow-Up Postings:

 o
RE: pouring concrete walkway

I see nothing wrong with having one edge of the walkway on the existing concrete structure.
I would have an expansion joint between the walkway and the existing pool edge and make sure the other edge of the walkway is deep enough not to be subjuct to erosion or frost heave.
A 3"-4" thickness on compacted ground, a gravel base, with wire mesh in the middle and stress relief groves every 30" or so should give you a good chance of avoiding cracking.


 o
RE: pouring concrete walkway

This is the first time I am pouring concrete and this means a lot to me. Thank You very much for responding.


 o
RE: pouring concrete walkway

Along with Randy's advise, you might want to drill some holes randomly in the existing concrete about every 16" or so down the center of the 6" boarder. Use a 3/4 to 1" masonry bit and a hammer drill. This will give the new concrete something to grab onto over the existing. You can also drill some 5/8" holes and epoxy in some 3/8 rebar every 16" or so and have the rebar stubbed up about an 1-1/2" and tie the wire mesh to the rebar stubs with wire. The horizontal wire mesh tied to the vertical rebar stubs will help keep the wire mesh up off of the existing concrete allowing the new to fill underneath the mesh as well as over it. You can use pre cast chock blocks to hold the mesh up over the compacted soils/gravel area. The big box stores have them in the concrete products section for fifty cents or so a piece. Basically a small chunk of concrete with a tie wire embedded in that you tie the mesh to to hold it up off the soils allowing crete to get underneath the mesh as well.


 o Post a Follow-Up

Please Note: Only registered members are able to post messages to this forum.

    If you are a member, please log in.

    If you aren't yet a member, join now!


Return to the Home Repair Forum

Information about Posting

  • You must be logged in to post a message. Once you are logged in, a posting window will appear at the bottom of the messages. If you are not a member, please register for an account.
  • Please review our Rules of Play before posting.
  • Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review your post, make changes and upload photos.
  • After posting your message, you may need to refresh the forum page in order to see it.
  • Before posting copyrighted material, please read about Copyright and Fair Use.
  • We have a strict no-advertising policy!
  • If you would like to practice posting or uploading photos, please visit our Test forum.
  • If you need assistance, please Contact Us and we will be happy to help.


Learn more about in-text links on this page here