24x40 unfinished second story should cost?

Posted by fallingwaters (My Page) on
Wed, Nov 10, 10 at 16:09

we're getting close to remodeling the kitchen addition and i want to add an unfinished second story space above it for future use.
besides the extra labor hours, what else should i count on for cost? the addition can have cathedral ceilings, but two storys' worth will be pricey as heck to heat in the northeast!
as i see it the roof will be the same; same trusses,same steel roofing, etc.
i'll need studs to hold up the second story at least, maybe a ceiling for the downstairs for heat retention.
also extra siding and insulation. i hope sheetrock can wait.
i know i can cut in windows, stairs, etc. at a later date if i plan well.
it should be more cost effective to do it this way than to wait ten years and take the roof off in order to add the second story.
what am i missing?


Follow-Up Postings:

 o
RE: 24x40 unfinished second story should cost?

Hmmm ... i'm wondering if it really is more cost effective to do this now than then? You'll be heating and possibly cooling unused space for 10 years, not to mention paying taxes on it. Not to mention, how is your house going to look with an addition with no windows, etc. in it for the next decade?

I think it might be minimally more economical to do it now, but 10 years down the road is a long time to sit with it. What if you change your mind about what you want up there? What if you need/decide to sell your house which would be essentially only partly finished?


 o
RE: 24x40 unfinished second story should cost?

I would expect you would be best served by at least doing rough-in electrical and windows to code for a bedroom


 o
RE: 24x40 unfinished second story should cost?

We considered doing just this. However, our plan was a 1-year, not a 10-year, to finish the second floor.
I DO agree with the previous posters that you should do windows and rough plumbing electrical.

Our plan: we'd figured out the basic layout of the upstairs. (You'll probably need some bearing walls in the interior, no? So figure out where they will be and what the room layout will be.) it'll certainly be easier to have a complete plan of the upstairs before starting, so you'll know where the stair will come down, and they builders will frame in the opening for the stairwell into the floor, etc. Personally I think I'd have the stairs done now and just have a closed door at the top... Our plan was:
-Have the builder do the exterior framing, roofing, window installation, exterior siding, interior stud wall framing.
-Since we DIY plumbing & electrical, we'd have carefully planned the rough-ins for those to correspond with the downstairs kitchen electrical and plumbing, and run plumbing stub-ins up through the floor and electrical up through the floor (that way the downstairs can be finished and you won't have to open up walls later to run stuff unpstairs!)
-We planned to leave the interior walls bare- just studs- but to insulate the exterior walls and seal them with vapor barrier. We felt that at that point it would be OK to leave the top floor unheated -or very slightly heated- until we finished it.

So, we'd have a finished downstairs, and a finished exterior. The stairway to the second floor would be sealed/closed with a door. Upstairs, the floor would be plywood subfloor, the interior walls just studs with plumbing and electrical rough-ins coming up through the sole plates but not going anywhere, and the exterior walls insulated and vapor-barriered.

I'm not sure I'd want to leave it like that for 10 years, though! What if circumstances changed and you had to sell the house or something? You'd have an empty shell.

And wi-sailorgirl's point about paying taxes is a good one. In my town that add'l living space would add a hefty chunk to the annual taxes :(

I guess an in-between solution might be to do the careful plans for the second floor now, and run the plumbing/electrical in the downstairs walls, and make sure your architect/builder knows that you intend to "pop the top" at a later date so that construction details can be planned to facilitate that later.


 o Post a Follow-Up

Please Note: Only registered members are able to post messages to this forum.

    If you are a member, please log in.

    If you aren't yet a member, join now!


Return to the Remodeling Forum

Information about Posting

  • You must be logged in to post a message. Once you are logged in, a posting window will appear at the bottom of the messages. If you are not a member, please register for an account.
  • Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review your post, make changes and upload photos.
  • After posting your message, you may need to refresh the forum page in order to see it.
  • Before posting copyrighted material, please read about Copyright and Fair Use.
  • We have a strict no-advertising policy!
  • If you would like to practice posting or uploading photos, please visit our Test forum.
  • If you need assistance, please Contact Us and we will be happy to help.


Learn more about in-text links on this page here