Hiring a plasterer to skim coat a concrete ceiling?

Posted by joe97 (My Page) on
Thu, Nov 26, 09 at 15:38

I have 600 square feet of concrete ceiling where the popcorn has been removed. I've decided to hire a plasterer to do a professional job in applying a skim cost so the surface is smooth. What should I look for in terms of materials to be used and expect for labor costs? This area is totally new to me. (Having done the kitchen ceiling I've decided to let a professional handle the rest.)

Thanks for the help,
Joe in New Jersey


Follow-Up Postings:

 o
RE: Hiring a plasterer to skim coat a concrete ceiling?

The plasterer will likely use a calcined-gypsum product....A 'setting-type' gypsum 'joint compound mix...with plaster added to enhance fast setting.

This product usually comes in 15, 30, 60 and 90 minute "pre-mixed" setting times if I remember correctly.

The ratio of plaster (a lime based compound that hardens by chemical reaction) to gypsum (a 'mud' made of gypsum and water which dries by evaporation) determines the time one can apply and finish the mix before it chemically hardens.

The cost of materials in such a case is minimal.

Finding a competant contractor who can do a superior job within the setting limits of the product is the challenge.


 o
RE: Hiring a plasterer to skim coat a concrete ceiling?

"The ratio of plaster (a lime based compound that hardens by chemical reaction) to gypsum (a 'mud' made of gypsum and water which dries by evaporation) determines the time one can apply and finish the mix before it chemically hardens."

Setting type joint compound hardens by chemical reaction (the same as plaster) and not by drying.

There would be no reason to add plaster to a setting type compound.

Gauging plaster is mixed with retarders or lime putty to slow the setting time, snce it is very short (less than 10 minutes) and not workable for finishing without being slowed down.

The combination of lime putty (weeks to months to fully sure) with plaster produces a reasonable setting time.


 o
RE: Hiring a plasterer to skim coat a concrete ceiling?

If you have a bag of Durabond 90, and a bag of gaging plaster, you have the ingredients to make a setting-type joint compound with a setting time from 90 minutes to 1 minute (goes off in the mud pan!) DAMHIKT!
If you're doing one small repair or area, you can "enliven" the durabond by adding in a little or a lot of gaging. It will set as fast as you can handle it.
Anyways, just because the durabond is "set" doesn't make it dry enough to finish! The water still is there, and has to process itself out before it can be painted. Rule of thumb: if it feels cold and clammy, it's not ready for paint even if a "cat couldn't scratch it".
Casey


 o Post a Follow-Up

Please Note: Only registered members are able to post messages to this forum.

    If you are a member, please log in.

    If you aren't yet a member, join now!


Return to the Remodeling Forum

Information about Posting

  • You must be logged in to post a message. Once you are logged in, a posting window will appear at the bottom of the messages. If you are not a member, please register for an account.
  • Please review our Rules of Play before posting.
  • Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review your post, make changes and upload photos.
  • After posting your message, you may need to refresh the forum page in order to see it.
  • Before posting copyrighted material, please read about Copyright and Fair Use.
  • We have a strict no-advertising policy!
  • If you would like to practice posting or uploading photos, please visit our Test forum.
  • If you need assistance, please Contact Us and we will be happy to help.


Learn more about in-text links on this page here