How do I install extra joist to prep for stone tile?

Posted by enduring (My Page) on
Fri, Jun 1, 12 at 10:18

I have started my bathroom remodel. I have planned to add extra joist to my floor in between the existing joist so that I can get the deflection score adequate for stone flooring, as per the JB web site calculator. I would then have approx. 10" on center joist.

According to the JB website calculations, this is my current floor status, with actual 21" o.c., old strong 2x8, probably douglas fir:

For joists that are SYP or Douglas Fir, in good condition, 7.25 inches tall, 1.5 inches wide, 20 inches on center, and 9.5 feet long between supports, the deflection calculated is 0.262 inches.

This translates to a deflection of L / 435.

Since the maximum deflection for tile is L / 360, and for natural stone is L / 720, your floor is rated for Ceramic tile, Congratulations!

If I add joist between these existing joist I can bring the floor up to:

For joists that are SYP or Douglas Fir, in good condition, 7.25 inches tall, 1.5 inches wide, 10 inches on center, and 9.5 feet long between supports, the deflection calculated is 0.131 inches.

This translates to a deflection of L / 871.

Since the maximum deflection for tile is L / 360, and for natural stone is L / 720, your floor is rated for Ceramic tile or Natural stone, Congratulations!

I want to get my floor to L/720 minimum, as recommended by this calculation, to install my 12x12 slate tile.

The floors are level and the existing joist are straight and level. The total area is about 6.5'x9.5' in the room. The crawl space has the joist running 9.5' with about 6 or so inches setting on a ledge at the far end of the room. The near end was toenailed into the ledger. Since the floor was level and the joist were level, using a 4' long level, we just installed joist hangers on the near end to maintain integrity of the existing joist. My subfloor is 3/4"x6" (or 8") diagonal. The flooring is 3/4"x3" T&G fir.

I got lots of good information from a post that I placed last fall. I will post a link below. What I didn't get straight was how to actually install the joist to the existing subfloor. I am thinking that one would toenail in the new joist into the bottom layer of the flooring only. My DH thought that we would just nail down into the joist from above going through the fir flooring and through the diagonal subfloor. This would be very easy to do but I don't know which is best for structure and safety of new stone tile.

My tile install over the existing fir floor and subfloor is planned, and is as follows:

3/8 exterior grade SYP plywood screwed 6" spacing throughout into the fir floor.

SLC primer

Electric floor warming system (cables not matt)

SLC

unmodified thinset (as per Schluter Ditra handbook, over concrete, since I wont be going directly over wood. Otherwise modified thinset is used over wood)

Ditra

unmodified thin set

Slate 12x12 tile

Questions:
How do I fasten the new 2x8 filler joist into place?
What fasteners to use, screws, nails?
If screws, hardened or not?

Here is a link that might be useful: Adding Joist to Existing & Intact Floor


Follow-Up Postings:

 o
RE: under the floor crawl space

Here is the image I forgot to add, to provide context:
Photobucket
Thanks, any info will be helpful.


 o
RE: How do I install extra joist to prep for stone tile?

Still looking for answer to question as to how to fasten new installed joist to the 2 layers of existing 3/4 fir. I will be adding a plywood layer of 3/8". I was thinking that I could treat the existing 2 layers as one and just nail or screw through both layers, from the top side, to get the floor anchored the length of the new joist.

What about that idea?

Here is #1 joist being installed by DH, #2 is waiting for tomorrow:
Allen installing joist hanger

New joist on the far right, it is the same size as the rest, it is just bolder:) :
1st added joist

Anyone out there to help me figure out if it is ok to just nail down through both old floors from the top side down into the new joist? Or should I have it screwed down. I will be adding a 3/8" ply underlayment that I will not be fastening to the joist and will not be having the edges join over the joist. Screw down 6"o.c. throughout. Ditra will be my decoupling membrane before the tile goes down.


 o
RE: How do I install extra joist to prep for stone tile?

So long as you're covering everything with Ditra, you can nail through both upper layers into the new joist, and in fact would be preferable to toenailing from underneath.


 o
RE: How do I install extra joist to prep for stone tile?

OH, THANK YOU, THANK YOU, THANK YOU BILL V!


 o
RE: How do I install extra joist to prep for stone tile?

Screws would be even better.


 o
RE: How do I install extra joist to prep for stone tile?

Thanks Brickeyee for the info, I've got both on hand. We'll see what works for us.


 o Post a Follow-Up

Please Note: Only registered members are able to post messages to this forum.

    If you are a member, please log in.

    If you aren't yet a member, join now!


Return to the Remodeling Forum

Information about Posting

  • You must be logged in to post a message. Once you are logged in, a posting window will appear at the bottom of the messages. If you are not a member, please register for an account.
  • Please review our Rules of Play before posting.
  • Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review your post, make changes and upload photos.
  • After posting your message, you may need to refresh the forum page in order to see it.
  • Before posting copyrighted material, please read about Copyright and Fair Use.
  • We have a strict no-advertising policy!
  • If you would like to practice posting or uploading photos, please visit our Test forum.
  • If you need assistance, please Contact Us and we will be happy to help.


Learn more about in-text links on this page here