compiler

About estimate

compiler
9 years ago

My unfinished attic estimate is written like HVAC supply covers, interior door units to match house, drywall install on walls and ceiling ready for paint, install ceiling fan ($120 allowance for fan), install toilet ($120 allowance), install toilet ($120 allowance), install new bathtub with faucet and trim ($140 allowance on faucet), install tile on floor on shower/tub wall ($3 allowance on tile per sq) etc. There are no materials specified. I have received three estimates like that. Is such an estimate ok or I should request the contractor to add something? What should be listed in the home remolding estimate or the most of the estimates are just like that? Thank you for your answer.

Comment (1)