Shop Products
Houzz Logo Print
listener_gw

Preparing site for pea gravel walkway

listener
10 years ago

I'm planning on building a pea gravel walkway. Currently, the site is compacted and covered with an inch of ledge gravel left over from construction that has been used as a temporary path. I'd like to till the soil before laying down a base and tamping, to make it easier to move the soil around, and because I will be tilling a field and have the equipment. Will the gravel be trouble for the tiller? Must I remove it by hand first?

Here's a photo of the site: http://imgur.com/GCUKSkE.jpg

Here is a link that might be useful:

Comments (8)