Gunite question...is builder trying to screw me?

Posted by rockadile (My Page) on
Mon, Jul 28, 08 at 11:48

I am in the process of getting a gunite pool installed. During excavation, they hit shale with about 1-2 feet to go. After paying extra for the shale removal, the gunite guys came out and did their thing. I just got a bill for "extra material" during the gunite phase due to rock. I am trying to understand how hitting rock requires extra material. Anyone have an ideas?


Follow-Up Postings:

 o
RE: Gunite question...is builder trying to screw me?

What does your contract say? It all depends really on what your contract says...


 o
RE: Gunite question...is builder trying to screw me?

The only thing the contract states is in the event of hitting rock, I am responsible for the cost per day of excavation plus extra materials. When I first reviewed the contract, I read this to mean any extra materials for excavation. I now realize that this could be read to mean extra gunite (and anything else for that matter). However, I am trying to find a reasonable explanation for why they would have needed additional gunite whether I had rock or not.


 o
RE: Gunite question...is builder trying to screw me?

Oh I guess I assumed the gunite people and excavation people were the same people. I can't see either how extra gunite would be required. Did they have to take out extra material to remove the rock and now they have to backfill it will extra gunite?


 o
RE: Gunite question...is builder trying to screw me?

It was shale which breaks apart. It seems they only took what they needed. When I came home after the rock breaker was there, my pool was dug and filled with the aggregate. It doesn't make any sense to me.


 o
RE: Gunite question...is builder trying to screw me?

Yeh sounds like they are just trying to get in the chow line because they saw an opportunity. Unless perhaps they are charging you for the aggregate as a back fill. What do they say?


 o
RE: Gunite question...is builder trying to screw me?

I left a message and am waiting to hear back from them. I would have thought it coulda been the aggregate (except the price was way higher). Also, it specifically mentions it is for the gunite phase. Since the excavator put the aggregate in, it can't be for that.


 o
RE: Gunite question...is builder trying to screw me?

Gunite is usually priced on the linear foot, depth and thickness. Unless one of those changed, you might be getting a ticket to ride.


 o
RE: Gunite question...is builder trying to screw me?

Good to know...thanks for the tip.


 o
RE: Gunite question...is builder trying to screw me?

Rockadile-

I build in Austin, and deal with rock everyday. The extra charge should be labeled as "overbreak" meaning that when you excavate rock, or shale, you have a very uneven surface. Gunite applied under pressure fills any and all gaps in the walls. IF excavation was kept tight, shouldn't have the need to "backfill", and charges shouldn't be more than a couple yds. or so. That is unless you're building big and deep.I would imagine the biggest expense happened when they attached the ram and started chipping the shale.

Your builder putting aggregate in the belly is the right way to go!

LPG


 o
RE: Gunite question...is builder trying to screw me?

I used to run into a lot of rock situations when I lived in Southern Ca. When you are dealing with rock, just as local pool guy stated you are left with big holes in the excavated pool area causing the gunite bill to even double at times. In most cases the gunite crew will hang buttonboard or sheet rock to make an attempt to fill the void without having to fill it all with gunite. I am not making excuses for your pool builder. When they hit rock during the excavation they should have told you all the implications to you financially before they continued on.


 o
RE: Gunite question...is builder trying to screw me?

Gunite in so cal is charged by the ton. Currently about $115/ton. If a pool is overdug or removal of rock creates a void below the normal depth of the gunite shoot, you will pay for the added material. While they do add sheetrock to back up the walls, I've never seen it on the floor. I'd rather have a firm foundation on the floor instead of a hole filled with stone.


 o
RE: Gunite question...is builder trying to screw me?

That's just it, there didn't look like anything out of the ordinary. The aggregate covered the vast majority of what was broken up and dug. There was no rock on the sides of the pool. And if there was I can't see how it would be enough to cost $2000+ of extra gunite. My pool is not that large and this happened only in the deep end which makes up at most 1/4 of my pool.


 o Post a Follow-Up

Please Note: Only registered members are able to post messages to this forum.

    If you are a member, please log in.

    If you aren't yet a member, join now!


Return to the Pools & Spas Forum

Information about Posting

  • You must be logged in to post a message. Once you are logged in, a posting window will appear at the bottom of the messages. If you are not a member, please register for an account.
  • Please review our Rules of Play before posting.
  • Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review your post, make changes and upload photos.
  • After posting your message, you may need to refresh the forum page in order to see it.
  • Before posting copyrighted material, please read about Copyright and Fair Use.
  • We have a strict no-advertising policy!
  • If you would like to practice posting or uploading photos, please visit our Test forum.
  • If you need assistance, please Contact Us and we will be happy to help.


Learn more about in-text links on this page here