|
Sun, Jun 3, 12 at 11:07
| At long last construction on our pool has begun. I have selected irridescent light blue glass tile (subway pattern) for the waterline. The installation specs say that the grout needs to cure a minimum of 21 days before submersing. My pool contractor is not happy about this. How critical is this wait time? I am in southern oregon and our weather now is beautiful 80 -90 with no humidity. Any chance of a shorter cure??? |
Follow-Up Postings:
|
| reedpool, Manufacturers want to cover their bases in all aspects. I have installed grout and added water in less than a week without problems. Also, no one doing repairs of grout would leave it for 21 days to cure! |
Please Note: Only registered members are able to post messages to this forum. If you are a member, please log in. If you aren't yet a member, join now!
Return to the Pools & Spas Forum
Instructions
- You must be a registered member and logged in to post messages on our forums.
- Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review the contents and make changes.
- After posting your message, you may need to refresh the forum page in order to see it.
- It is illegal to post copyrighted material without the owner's consent.
- HTML codes are allowed in the message field only.
- No advertising is allowed in any of the forums.
- If you would like to practice posting or uploading photos, please visit our Test forum.
- If you need assistance, please Contact Us and we will be happy to help.