Here are a few of today's images of our pool.

We broke ground in late July, and have had few problems along the way. The watefall and rock guy should be done in a week, then my contractor says it should be two more weeks for the pebble and flagstone. Can't wait for it to be done.

stats:

20' x 40'

beach entry (sand colored pebble)

dark blue pebble for the body of the pool

spa

cozy

3' deep to 6' deep

Waterfall is 8' feet high at top of slide

slide is 11'

two spillways

building fire pot into waterfall, along with 4 plant pots.

all salt water.

water in the pool is the result of last weekend's thunderstorms.