Shop Products
Houzz Logo Print
scl4_gw

Final Remodel Photos

scl4
16 years ago

Here are the final pics from our recent pool remodel. Although I captured a rainbow this morning, I have yet to get a killers sunset pic. I'll be home around sunset tonight so hopefully it will be a good one.

The project took 9 work days and included removel of old plaster and replacing the surface with tile throughout.

New equipment includes a SWCG, pool sweep, and acid pump. The discolored and cracked concrete surface was repaired and coated with concrete paint.

http://s180.photobucket.com/albums/x117/sclewis57/

Comments (2)