Return to the Pools & Spas Forum | Post a Follow-Up

 o
Cement Pool Coping Help

Posted by Vaqua (My Page) on
Mon, Mar 19, 12 at 21:28

IN process of replastering and recouping the pool, cut out 10" of cement from the edge of the entire pool, completed the framing but was wondering if we need to use rebar to connect the new cement oping into the main pool deck or keep it separate, your thoughts and insight is highly welcomed.

Image link: Cement Pool Coping Help (32 k)


Follow-Up Postings:

 o Post a Follow-Up

Please Note: Only registered members are able to post messages to this forum.

    If you are a member, please log in.

    If you aren't yet a member, join now!


Return to the Pools & Spas Forum

Information about Posting

  • You must be logged in to post a message. Once you are logged in, a posting window will appear at the bottom of the messages. If you are not a member, please register for an account.
  • Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review your post, make changes and upload photos.
  • After posting your message, you may need to refresh the forum page in order to see it.
  • Before posting copyrighted material, please read about Copyright and Fair Use.
  • We have a strict no-advertising policy!
  • If you would like to practice posting or uploading photos, please visit our Test forum.
  • If you need assistance, please Contact Us and we will be happy to help.


Learn more about in-text links on this page here