|
Mon, Mar 23, 09 at 0:46
| I installed a freeform fiberglass pool last summer.But the concrete contractor was possibly the worst in North America.So now I have the job of removing the concrete deck that is surrounding the pool now and replacing it.Luckly he did not pour the concrete right and it is not connected to the pool.So after I finsh breaking it up I would like to put tile down.Here lies my first question what steps do i need to take as far as prep under the edge of the pool lip and from their can I lay the tile to the outer edge of the pool or will I have to do coping? |
Follow-Up Postings:
Please Note: Only registered members are able to post messages to this forum. If you are a member, please log in. If you aren't yet a member, join now!
Return to the Pools & Spas Forum
Instructions
- You must be a registered member and logged in to post messages on our forums.
- Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review the contents and make changes.
- After posting your message, you may need to refresh the forum page in order to see it.
- It is illegal to post copyrighted material without the owner's consent.
- HTML codes are allowed in the message field only.
- No advertising is allowed in any of the forums.
- If you would like to practice posting or uploading photos, please visit our Test forum.
- If you need assistance, please Contact Us and we will be happy to help.