Shop Products
Houzz Logo Print
fixizin

Pro tricks for "de-watering" horiz. Cu runs prior to sweating??

fixizin
10 years ago

Howdy Gang, it's good to be back! (I actually get caught up sometimes.) :D

Anyways, buddy has a long (and apparently perfectly level) run of 3/4" copper. Along this run is a coupler that needs to become a tee.

Have done the shop-vac blowing into the hose bib (w/OUT anti-siphon) at far end, expelling water from hose bib WITH anti-siphon at the other end. Still boiling water with my torch--not even blistering some old latex paint, let alone melting solder.

There is some minor leak-by at the shutoff valve, but *apparently* only a few ounces overnight.

I have suggested drilling a 1/8" hole in the doomed coupler, as even if one or both pipe ends are perforated, pipe needs to be cut back anyway, since end-spacing much greater for Tee than coupler... buddy is resisting this.

SO... any tips and tricks from the pros on how to DEHYDRATE this copper canyon?

Thanks in advance.

Comments (5)