Shop Products
Houzz Logo Print
progsooner

aerobic septic system/sprinkler question

progsooner
17 years ago

Our house has an aerobic septic system. We just put in an in-ground pool. We now need to move the two sprinkler heads that discharge the water from the septic. I have had a difficult time getting the septic guys to come out. I was thinking about asking the sprinkler system guy to "rework or move" the aerobic system heads during the time he would be there to replace the regular sprinkler system as this needs to be reworked from the pool construction. Does the septic guys have to do this or can the sprinkler system guy move the heads?

Comments (4)