Shop Products
Houzz Logo Print
seaswirl_gw

How long should it take a master plumber to do the following jobs

seaswirl
10 years ago

1. Connect a gas stove - gas line and flexible tubing are there.
2. Connect 2 bathroom sinks & faucets - plumbing is already there.
3. Replace 1 toilet.
4. Connect dishwasher - plumbing is there.
5. Install tub/shower trim w/extension kit.

Comments (5)

Sponsored
Kuhns Contracting, Inc.
Average rating: 5 out of 5 stars26 Reviews
Central Ohio's Trusted Home Remodeler Specializing in Kitchens & Baths