Return to the Plumbing Forum | Post a Follow-Up

 o
basement venting

Posted by oldnorskie (My Page) on
Tue, Feb 8, 11 at 10:46

getting ready to cut basement slab to add a bath. i'm re-routing a 3" line from first floor bath to go under the basement slab with (2) 90's for about 15' and tie into an existing 4" c.i. to street. i'll wye into the 3" line from toilet, tub & shower (all less than 6') and 1-1/2" from lav will run into the 2" shower line with AAV under the countertop. am i ok on venting depending on the 4" c.i. line as a wet vent with a vent stack upstream about 18' ? thank you. al


Follow-Up Postings:

 o
RE: basement venting

sounds to me like there's no real vent, and you are proposing only an AAV and the (so-called) wet venting.

is this reading correct?


 o
RE: basement venting

yes , that's my plan. will it work reliably?


 o
RE: basement venting

no. it will not work.

2/ where in your entire house are the real vents?

3/ you will need master plumber input.


 o
RE: basement venting

the main 4" c.i. line i'm tying into has a vent stack about 18' upstream & services a toilet on the first floor.


 o
RE: basement venting

The critical distance is the 15' one.

The fact that "the main 4" c.i. line i'm tying into has a vent stack about 18' upstream..." was the one thing you should not have mentioned in your first post, as it is irrelevant and only serves to show how little you know. No offense. I read and re-read your first post many times. It is a bit dense and it takes a while to figure out.

Repeating your "18ft distance" information in another post confirms my hunch and my reading of your situation, and it shows how little you have learned. Go learn and come back. Or, hire a Master Plumber. Or, stop asking if you can do it the way you asked in your first post.

If you post at other plumbing sites you may want to rewrite the first post completely. Please accept this information and advice in the spirit in which it was given. I'm not a plumber; feel free to post again, with new news or to ask for more input from more people.

Hth


 o
RE: basement venting

thank you for your comments. i should have mentioned that the 3" line i'm re-routing serves a toilet on the first floor and is on a vented stack. so, i have a vented stack at the head of the 3" line and at the head of the 4" main line. does this clarify the drainage issue in the 3"? also have a drawing which might help: http://img204.imageshack.us/img204/3642/basei.jpg

thank you


 o Post a Follow-Up

Please Note: Only registered members are able to post messages to this forum.

    If you are a member, please log in.

    If you aren't yet a member, join now!


Return to the Plumbing Forum

Information about Posting

  • You must be logged in to post a message. Once you are logged in, a posting window will appear at the bottom of the messages. If you are not a member, please register for an account.
  • Please review our Rules of Play before posting.
  • Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review your post, make changes and upload photos.
  • After posting your message, you may need to refresh the forum page in order to see it.
  • Before posting copyrighted material, please read about Copyright and Fair Use.
  • We have a strict no-advertising policy!
  • If you would like to practice posting or uploading photos, please visit our Test forum.
  • If you need assistance, please Contact Us and we will be happy to help.


Learn more about in-text links on this page here