Posted by Brandywine72 (My Page) on
Tue, Oct 8, 13 at 10:56

I have no idea how long it should take to have somebody reinstall these cabinets that you see in the picture below: Five hours? 10 hours? Two days? I am clueless. This picture is a "before". Our "after" necessitates reinstalling them in a slightly different order, and our walls are plaster, so I don't know if that takes longer than going into drywall. My question is about cabinets only NOT including countertop reinstallation.

Can folks toss out some general ideas on what they think?

(I am not asking because of price but just because I want to know what is a reasonable amount of time. The carpenter who is doing it is charging by the job, not by the hour, but it took him soooooo long to install the floor - 2 weeks! - that I am ready for today to be his last day if he is taking too long with the cabinet install. I might have somebody else who can probably do it faster. I just don't know what the reasonable amount of time is.

The carpenter who is here now is very nice but seems completely ADD. And, his nephew is here as his helper "apprentice" and I can hear him downstairs teaching him every single step of what he is doing, which is one of the many reasons why it is taking twice as long. This is driving me nuts. I want my kitchen back!)


Follow-Up Postings:

 o
RE: How long should cabinet install take?

It depends on how straight and plumb your walls and floor are, the number of cabinets, the number of applied side panels needed, the amount of molding needing to be cut and applied, and a host of other things. For a simple small kitchen in a condo, you might be looking at a day's worth of work. For a more complex kitchen in an older larger home, you could be looking at a week. For a project where you are waiting on parts or pieces that were missing or damaged, you cold be half done for 6 weeks, and then finished up in a day or two. There are so many variables, and skill levels, that "average" doesn't exist. However, yours looks small and not too complicated. I'd have to say 2 days. 3 tops.


 o
RE: How long should cabinet install take?

Hollysprings - Thanks for helping me understand what all goes into an installation. I can now see how there is no "average".

Our kitchen is small. It is literally what you see in the picture plus the dishwasher and sink. Our house is very old and we took everything out to have foundation work done as well as a new ceiling put in because the joists needed to be reworked. So, with a new ceiling and new floor, I can see how they would need to do a lot of figuring to make sure the walls and ceilings are straight. Given the age of our house (1851) and the often sloppy work of the other contractors we had in here, I am assuming things are not straight! Still, the 2-ish day range is helpful. I had no idea what to look for.


 o
RE: How long should cabinet install take?

I have about the same number of cabinets as you and the install was two days or less with a two-man team.


 o
RE: How long should cabinet install take?

There is nothing wrong with having a little chat with your carpenter about wanting to get the job done faster. Training his employees should not interfere with a decent time frame for getting your job done. On the plus side, at least you are not paying by the hour!


 o
RE: How long should cabinet install take?

Three of us installed (19) frameless boxes and (2) panels in (8) hours, from unpacking in the garage to mounted on the walls level and plumb.

The electrician misplaced a ceiling can. We had to move it and do the repair too. (4) boxes before lunch, (15) after.


 o
RE: How long should cabinet install take?

Thanks for your input. All these comments are so helpful.

Well, it is the end of his work day and 4 upper cabinets minus the trim are in plus the range hood, which involved some finagling of wires and routing out the plaster wall. I think at this rate it will take him to the the end of the week to get it all together with touch ups, trim, and hopefully installing a temporary plywood counter.

I had a talk with him this weekend about how long it was taking and that we were disappointed with the pace of things. And, we told him we were not going to sign another contract with him to do a second batch of work unless we saw a more rapid pace this week. He seemed crestfallen that we were unhappy; he really is a nice guy who aims to please but just misses the mark. (He is starting to remind me of the guys I used to teach in a prison work release program - good intentions but zero life skills.) We thought the threat of not giving him more work was a good carrot to dangle in front of him, but I don't think it is working and we certainly are not going to sign another contract.


 o
RE: How long should cabinet install take?

The kitchen cabinets in my 11x12 kitchen plus a china cabinet in the adjoining dining room were completely installed in 10-1/2 hours and that included putting on the hardware. The cabinets were installed by four Amish carpenters and everything was a perfect fit so thy did not have to come back.
Photobucket Pictures, Images and Photos


 o
RE: How long should cabinet install take?

That is helpful to know Badgergal. It sounds like if you had 40 person hours for your kitchen, then it could take 4 days for my guy to install ours. He is doing the work himself, the nephew is his gofer but not really doing the work. Your kitchen looks beautiful. I have never seen cabinets like that. I live in PA... probably plenty of Amish carpenters around here too.


 o
RE: How long should cabinet install take?

That is helpful to know Badgergal. It sounds like if you had 40 person hours for your kitchen, then it could take 4 days for my guy to install ours. He is doing the work himself, the nephew is his gofer but not really doing the work. Your kitchen looks beautiful. I have never seen cabinets like that. I live in PA... probably plenty of Amish carpenters around here too.


 o
RE: How long should cabinet install take?

Our u-shaped kitchen, plus a wall of pantry cabinets, was installed by 2 guys in 1 day. Day 2, doors and hardware were added, crown molding installed, doors and drawers adjusted. Day 3 (just the morning), final adjustments were made, and the counters templated.


 o
RE: How long should cabinet install take?

It took a little over a day to do our very small kitchen, but I am thrilled with the results, and the granite people told me they love to work with this company as everything is always level, easy to work with... we're having granite installed on Thursday, am getting excited!


 o Post a Follow-Up

Please Note: Only registered members are able to post messages to this forum.

    If you are a member, please log in.

    If you aren't yet a member, join now!


Return to the Kitchens Forum

Information about Posting

  • You must be logged in to post a message. Once you are logged in, a posting window will appear at the bottom of the messages. If you are not a member, please register for an account.
  • Please review our Rules of Play before posting.
  • Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review your post, make changes and upload photos.
  • After posting your message, you may need to refresh the forum page in order to see it.
  • Before posting copyrighted material, please read about Copyright and Fair Use.
  • We have a strict no-advertising policy!
  • If you would like to practice posting or uploading photos, please visit our Test forum.
  • If you need assistance, please Contact Us and we will be happy to help.


Learn more about in-text links on this page here