Shop Products
Houzz Logo Print
lucas_tx_gw

Barker Anatomy Take Two-Trim

lucas_tx_gw
10 years ago

For the sake of review, here is what the toe kick cabs look like without the toe kick.

After.

We did one piece to cover the cab and the DW toe kick. Used the velcro to attach it. (Thanks for that GW).


Next up was the crown molding. It's a 2" backer and then the Shaker trim.

Without

After backer installed

With the crown installed

There is also a new trim piece below the doors on that fridge cab.

Other before/afters

Only one remaining piece of cabinetry to go, and that's the UCL trim but it will be a long time before we get to that because we first need counters, then backsplash, then the UCL trim.

Hope someone finds this helpful!

Sponsored
Kuhns Contracting, Inc.
Average rating: 5 out of 5 stars26 Reviews
Central Ohio's Trusted Home Remodeler Specializing in Kitchens & Baths