Return to the Kitchens Forum | Post a Follow-Up

 o
Kitchen Remolding

Posted by bratscarlet (My Page) on
Fri, May 17, 13 at 17:14

I am having my kitchen ceiling painted and the popcorn removed. I am also going to install 5 cans recess lighting, and have two different contractors. What should be done first.


Follow-Up Postings:

 o
RE: Kitchen Remolding

I'd probably get the recessed lights installed first. If the contractor does a bit of damage to the ceiling, it can be easily rectified before the ceiling is painted.


 o Post a Follow-Up

Please Note: Only registered members are able to post messages to this forum.

    If you are a member, please log in.

    If you aren't yet a member, join now!


Return to the Kitchens Forum

Information about Posting

  • You must be logged in to post a message. Once you are logged in, a posting window will appear at the bottom of the messages. If you are not a member, please register for an account.
  • Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review your post, make changes and upload photos.
  • After posting your message, you may need to refresh the forum page in order to see it.
  • Before posting copyrighted material, please read about Copyright and Fair Use.
  • We have a strict no-advertising policy!
  • If you would like to practice posting or uploading photos, please visit our Test forum.
  • If you need assistance, please Contact Us and we will be happy to help.


Learn more about in-text links on this page here