Return to the Kitchens Forum | Post a Follow-Up

 o
How close was the estimate?

Posted by annkh (My Page) on
Tue, Feb 26, 13 at 21:40

I'm in the planning stages of a kitchen remodel. I have estimates for custom cabinets, electrical, quartz countertops, and flooring. We'll have a little plumbing for a different sink (same location), and a bit of drywall work after moving a couple of outlets. DH and I will be tearing out the old cabinets ourselves.

I'm planning on 10% for contingencies.

How closer were your estimates to the actual cost of your kitchen remodels?


Follow-Up Postings:

 o
RE: How close was the estimate?

My bathroom gut job was 15% under even with all my "while you're here" additions, which was amazing. I wish that would happen more often. The contractors I have spoken to here for kitchen have built in 15% contingency to their bids. Is this practice widespread?


 o Post a Follow-Up

Please Note: Only registered members are able to post messages to this forum.

    If you are a member, please log in.

    If you aren't yet a member, join now!


Return to the Kitchens Forum

Information about Posting

  • You must be logged in to post a message. Once you are logged in, a posting window will appear at the bottom of the messages. If you are not a member, please register for an account.
  • Please review our Rules of Play before posting.
  • Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review your post, make changes and upload photos.
  • After posting your message, you may need to refresh the forum page in order to see it.
  • Before posting copyrighted material, please read about Copyright and Fair Use.
  • We have a strict no-advertising policy!
  • If you would like to practice posting or uploading photos, please visit our Test forum.
  • If you need assistance, please Contact Us and we will be happy to help.


Learn more about in-text links on this page here