Return to the Kitchens Forum | Post a Follow-Up

 o
Kitchen remodel- windows installed last !?

Posted by sunshine626 (My Page) on
Wed, Jan 15, 14 at 14:40

I am knee deep in the process of my remodel and was just notified that my windows with a drywall return won't be -delivered- until after the cabinets are installed. (3 weeks from today, yikes) We are down to studs and I am freaking a little bit. We can make this work, right? I need some ideas :)


Follow-Up Postings:

 o
RE: Kitchen remodel- windows installed last !?

I'll just tell you my story and let you decide whether you need to worry. We bought our cabinets and tile before a 7 ft wide window was installed over our sink in our yet to be finished totally remodeled kitchen. Space previously had no window.

Well, the cabinet finish/color/tone clashes with the floor to the extent that I can't live with it though I have tried to dismiss the difference.

I feel fairly sure the clash is largely due to the new window (of which there is a very large amount - west side where house gets most). I am now trying to set up the replacement of the cabinet doors/panels to something that won't clash. Luckily they are Ikea and also luckily, my kitchen will be two-toned, uppers are all white so I don't have to touch them in this replacement project.

My advice - make sure you are prepared for differences in lighting. In talking with others about this, this is not an uncommon mistake for designers (maybe inexperienced) to make. Good luck.
More info on my clash problem here


 o
RE: Kitchen remodel- windows installed last !?

People replace their windows in completed kitchens all the time, how is this different?


 o
RE: Kitchen remodel- windows installed last !?

Hopefully OP noticed that I mentioned in our case, no window had been there before.


 o
RE: Kitchen remodel- windows installed last !?

erasing duplicate

This post was edited by elphaba on Wed, Jan 15, 14 at 17:11


 o
RE: Kitchen remodel- windows installed last !?

Thank you all- I'm a first timer at the remodel process and we were tying to do things in "order". Hahaha!!
Hoped to install windows, drywall, texture and paint before the cabinets went in.
My window guy forgot to place our order on time and our cabinet guy has a tight schedule.
I realize now it is all going to be ok, just a hiccup in the process!


 o Post a Follow-Up

Please Note: Only registered members are able to post messages to this forum.

    If you are a member, please log in.

    If you aren't yet a member, join now!


Return to the Kitchens Forum

Information about Posting

  • You must be logged in to post a message. Once you are logged in, a posting window will appear at the bottom of the messages. If you are not a member, please register for an account.
  • Please review our Rules of Play before posting.
  • Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review your post, make changes and upload photos.
  • After posting your message, you may need to refresh the forum page in order to see it.
  • Before posting copyrighted material, please read about Copyright and Fair Use.
  • We have a strict no-advertising policy!
  • If you would like to practice posting or uploading photos, please visit our Test forum.
  • If you need assistance, please Contact Us and we will be happy to help.


Learn more about in-text links on this page here