Return to the Garages/Workshops Forum | Post a Follow-Up

 o
Remove ceiling joist?

Posted by alpiner (My Page) on
Mon, Nov 6, 06 at 16:14

I have a 24 by 14 ft freestanding garage. It has a hip roof made of 2x4s on 24" centers. The two 'hips' at either end are about 8 ft with a 8 foot section of 4 triangle framed rafters in the center. This is all open framed with no ceiling and only sheathing and tiles.

My question. Could I remove one of the middle ceiling joists(rafters will not be removed). Can I double up on the rafters and ceiling joists on either side of the ceiling joist to be removed. Would it then be okay to then remove this one ceiling joist? This would leave a 4 ft spread between two of the ceiling joists (but rafters remain in place) I could even double up using 2x6's on the adjacent ceiling joists if necesary.

Any advice appreciated how to eliminate one middle ceiling joist.


Follow-Up Postings:

 o Post a Follow-Up

Please Note: Only registered members are able to post messages to this forum.

    If you are a member, please log in.

    If you aren't yet a member, join now!


Return to the Garages/Workshops Forum

Information about Posting

  • You must be logged in to post a message. Once you are logged in, a posting window will appear at the bottom of the messages. If you are not a member, please register for an account.
  • Please review our Rules of Play before posting.
  • Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review your post, make changes and upload photos.
  • After posting your message, you may need to refresh the forum page in order to see it.
  • Before posting copyrighted material, please read about Copyright and Fair Use.
  • We have a strict no-advertising policy!
  • If you would like to practice posting or uploading photos, please visit our Test forum.
  • If you need assistance, please Contact Us and we will be happy to help.


Learn more about in-text links on this page here