|
Thu, Aug 23, 12 at 14:53
| We want to replace wall to wall carpeting with hardwood. Our house is older (built '58) so we are just assuming that the two layers of tile underneath have asbestos. We were going to encapsulate it with a self leveling compound. But, as we are pulling up the carpet nail boards, the second layer of tile is loosening but not coming off. That tile looks like plastic parquet flooring so it is probably from the 70s but there is no way to know. We are going to get a chunk of tile tested to be sure but I'm trying to look at options. Hiring a professional company to remove it will bust the budget.
Can we put the self leveling compound over the not completely bonded tiles or will that cause us problems down the road? Can we just stop pulling up the nail boards and put leveling compound over everything? |
Follow-Up Postings:
Please Note: Only registered members are able to post messages to this forum. If you are a member, please log in. If you aren't yet a member, join now!
Return to the Flooring Forum
Instructions
- You must be a registered member and logged in to post messages on our forums.
- Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review the contents and make changes.
- After posting your message, you may need to refresh the forum page in order to see it.
- It is illegal to post copyrighted material without the owner's consent.
- HTML codes are allowed in the message field only.
- No advertising is allowed in any of the forums.
- If you would like to practice posting or uploading photos, please visit our Test forum.
- If you need assistance, please Contact Us and we will be happy to help.