|
| After years of wondering ... We took apart most of our Floor to Ceiling FP. Now we are wondering how much more do we take down?
Goal # 1 was to remove top brick so we could (a) have a mantle above FP and (b) so we can easily hide speaker wires behind (new)crown molding for surround sound system.
Lessons leaned so far:
Picture of getting started:
So this is where we are at today. The opening is perfect for the insert. The wall after repairs and painting will be ready for crown molding. We are thinking we want to remove the "pop-out" to make it easier to build a mantle on. We are not sure how to get the metal support piece out yet. I hope this helps some of you who have been wondering what's behind your FP bricks! |
Follow-Up Postings:
Please Note: Only registered members are able to post messages to this forum. If you are a member, please log in. If you aren't yet a member, join now!
Return to the Fireplaces Forum
Instructions
- You must be a registered member and logged in to post messages on our forums.
- Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review the contents and make changes.
- After posting your message, you may need to refresh the forum page in order to see it.
- It is illegal to post copyrighted material without the owner's consent.
- HTML codes are allowed in the message field only.
- No advertising is allowed in any of the forums.
- If you would like to practice posting or uploading photos, please visit our Test forum.
- If you need assistance, please Contact Us and we will be happy to help.