concrete driveway pitch

Posted by rmoore125 (My Page) on
Sun, Nov 25, 07 at 9:24

I recently had a new driveway and garage slab poured. When I first looked at it, it looked lopsided. I measured the drop from end to end and found that it drops 13 inches on one side and 5 on the other, with variations in between (the driveway is 50 feet long).
The drive is to park an RV on, so I need it reasonably level.
The contractor says it's not possible to do what I asked, even though he assured me it was before he poured the concrete. My question is, is it unreasonable to ask him to fix the driveway now that it's poured?


Follow-Up Postings:

 o
RE: concrete driveway pitch

13" in 50' is 1/4" per ft which is considered the minimum for good watershed.


 o Post a Follow-Up

Please Note: Only registered members are able to post messages to this forum.

    If you are a member, please log in.

    If you aren't yet a member, join now!


Return to the Home Disasters Forum

Information about Posting

  • You must be logged in to post a message. Once you are logged in, a posting window will appear at the bottom of the messages. If you are not a member, please register for an account.
  • Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review your post, make changes and upload photos.
  • After posting your message, you may need to refresh the forum page in order to see it.
  • Before posting copyrighted material, please read about Copyright and Fair Use.
  • We have a strict no-advertising policy!
  • If you would like to practice posting or uploading photos, please visit our Test forum.
  • If you need assistance, please Contact Us and we will be happy to help.


Learn more about in-text links on this page here