|
Sun, Nov 25, 07 at 9:24
| I recently had a new driveway and garage slab poured. When I first looked at it, it looked lopsided. I measured the drop from end to end and found that it drops 13 inches on one side and 5 on the other, with variations in between (the driveway is 50 feet long).
The drive is to park an RV on, so I need it reasonably level. The contractor says it's not possible to do what I asked, even though he assured me it was before he poured the concrete. My question is, is it unreasonable to ask him to fix the driveway now that it's poured? |
Follow-Up Postings:
|
- Posted by lazypup (lazypup@yahoo.com) on Mon, Nov 26, 07 at 11:34
| 13" in 50' is 1/4" per ft which is considered the minimum for good watershed. |
Please Note: Only registered members are able to post messages to this forum. If you are a member, please log in. If you aren't yet a member, join now!
Return to the Home Disasters Forum
Instructions
- You must be a registered member and logged in to post messages on our forums.
- Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review the contents and make changes.
- After posting your message, you may need to refresh the forum page in order to see it.
- It is illegal to post copyrighted material without the owner's consent.
- HTML codes are allowed in the message field only.
- No advertising is allowed in any of the forums.
- If you would like to practice posting or uploading photos, please visit our Test forum.
- If you need assistance, please Contact Us and we will be happy to help.