Shop Products
Houzz Logo Print
adr1234

Rotten Plywood in Standin Bathroom

adr1234
9 years ago

We wanted to replace the tiles of bathroom, on riping the tile we found that the plywood (before tyvek) was rotten in few place because of which now we have to replace the plywood in those affected section. This will lead us to remove the sidings and then install fresh plywood / tyvek. Question is: can i replace the plywood by removing the existing sidings and change the plywood in around 30 degree temperature or should i hold onto that till spring for removal of sidings?.
REgards
adr

Comments (2)