|
Tue, Oct 16, 12 at 22:21
| I used Redgard over Easyboard/Wonderboard in my basement bathroom. I'm gathering most people say leave it a week. They're 8" square tiles for the most part, if that makes a difference.
House is heated, no humidifier running right now. +- 20.5C I left the bathroom fan running. It would be nice if I could grout this Thursday or on the weekend, but I don't know if it's too soon. Started Saturday afternoon, finished Monday. |
Follow-Up Postings:
|
| It's sort of an unknown. Usually you can grout the next day. But you have RedGard, so you want to wait longer. You have smaller (than 12") tiles, that works in your favor in terms of allowing faster drying. The more modified your thinset, the longer you'd want to wait; Flexbond longer than Versabond, for example. If the thinset was mixed wet, longer. So believe it or not, there's no real definitive answer. If you can let it go to the weekend, that'd be safer. |
|
- Posted by alan_s_thefirst (My Page) on Wed, Oct 17, 12 at 12:22
| Thanks, I can do that. Kind of what I thought. |
Please Note: Only registered members are able to post messages to this forum. If you are a member, please log in. If you aren't yet a member, join now!
Return to the Bathrooms Forum
Instructions
- You must be a registered member and logged in to post messages on our forums.
- Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review the contents and make changes.
- After posting your message, you may need to refresh the forum page in order to see it.
- It is illegal to post copyrighted material without the owner's consent.
- HTML codes are allowed in the message field only.
- No advertising is allowed in any of the forums.
- If you would like to practice posting or uploading photos, please visit our Test forum.
- If you need assistance, please Contact Us and we will be happy to help.