|
Sun, Oct 7, 12 at 12:31
| Hello,
I am coating my cement board with Hydroban before tiling and want to install a grab bar on the wall above the tub after tiling. Iunderstand having to place a suitable backing board behind the cement board , but how do I ensure the screw holes for the bar don't allow water in behind the Hydroban ? Thank you, Salbwil |
Follow-Up Postings:
|
| I'll drill pilot holes, fill them with squirts of silicon or sealant, then insert the screws. Clean up any squeeze out. |
|
| Thank you ! Will do this. Salbwil |
Please Note: Only registered members are able to post messages to this forum. If you are a member, please log in. If you aren't yet a member, join now!
Return to the Bathrooms Forum
Instructions
- You must be a registered member and logged in to post messages on our forums.
- Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review the contents and make changes.
- After posting your message, you may need to refresh the forum page in order to see it.
- It is illegal to post copyrighted material without the owner's consent.
- HTML codes are allowed in the message field only.
- No advertising is allowed in any of the forums.
- If you would like to practice posting or uploading photos, please visit our Test forum.
- If you need assistance, please Contact Us and we will be happy to help.