|
Fri, May 11, 12 at 7:39
| Hi all, I bought this roll on membrane to install on hardi backer board I have already put 4 mill plastic behind the backer board. Bathroom will be tiled from floor to ceiling and is only 5' x 8' ( lots of moisture ). Question is do I need to go ahead and put this on the floor and walls as far up as I can go. Its a 1 gallon pale so I'm not sure just how many SF. it will cover. Please advise. Bob |
Follow-Up Postings:
|
| Based upon your questions, I recommend you read the "Tech Data Sheet" via the link on this page. The pdf has everything you need to know regarding the product, and then some. |
Please Note: Only registered members are able to post messages to this forum. If you are a member, please log in. If you aren't yet a member, join now!
Return to the Bathrooms Forum
Instructions
- You must be a registered member and logged in to post messages on our forums.
- Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review the contents and make changes.
- After posting your message, you may need to refresh the forum page in order to see it.
- It is illegal to post copyrighted material without the owner's consent.
- HTML codes are allowed in the message field only.
- No advertising is allowed in any of the forums.
- If you would like to practice posting or uploading photos, please visit our Test forum.
- If you need assistance, please Contact Us and we will be happy to help.