Contractor costs?

Posted by brlb (My Page) on
Tue, Jun 27, 06 at 21:12

I am planning to remodel my bath & very small half bath. I am buying all the materials myself but am not doing any of the labor. Basically the bathrooms have to be completely redone, except for the wall tiles that are remaining. We are getting new plumbing (toilets, sinks, refacing the tub, new faucets, floors, vanity). The layouts of the baths are remaining the same. Any ideas about how much contractor could charge for the job? I am very confused!!


Follow-Up Postings:

 o
RE: Contractor costs?

This was EXACTLY how our project began. One full bath and one half-bath, both fairly small. We didn't move any plumbing, replace the tiles, or the tub. However, we did add some electrical outlets and replace the flooring. (See the pix of our finished main bath on my thread below.)

We purchased all the fixtures and accessories, and subcontracted the floor and countertops. Our GC bid $3500 for both jobs, but seriously underestimated how much time and work this job would entail. Later he told us he lost a lot of money on the job. We did expand the scope, and some other changes brought the final job to $4500.

Depending on the region you live in and whether you are in a large city or smaller market, I would expect the contractor's fees to be under $10,000 for both baths. You are providing the fixtures (where normally the contractor makes his profit).

When you are going over the contract with him, set some sort of timetable for the major portions of the job, and if there are changes or delays, put these in writing and both of you sign off on them. Verbal agreements can backfire on you.

And be prepared for unexpected delays (for us, it was illness on both sides, and a sewer backup into the bathroom which had just been refloored.) If these are truly no one's fault, the GC should not be penalized.

Hope that helps!


 o
RE: Contractor costs?

We are paying $8200 to the GC for a 7X9 bathroom, but that includes
demolition and removal of everything including all the tile
framing in a new window
installing sconces
installing 2 can ceiling lights
a 66" semicustom cabinet
a small wall 19 inches wide between the tub and the cabinet
framing two recessed medicine cabinets
installing an exhaust fan through to the roof (there isn't one now)
adding plumbing for two sinks (there is only one now)
framing in and getting ready for tiling a large bathtub adding the shower-(there isn't one now).
All associated plumbing
Adding another electrical switch for the fan and can lights
installing a full cabinet length mirror
removing all the plaster, smoothing and either drywall or plastering smooth (it has big ugle swirly things now)
Painting

We are purchasing:
bathtub
two sinks
mirror
medicine cabinets
paint
faucets
bathtub drain
bathtub spout
shower fixture
tile
granite or marble (our fabricator who is doing our kitchen is just giving us our bathroom granite/marble for the cabinet top for free if we will choose one of his many left over pieces:)We choose tomorrow)
reusing toilet
a new toilet seat
towel racks, etc.
the exhaust fan and ducting
And paying the tile guy separately

We budgeted $12,500 with all the labor for the tile. We are coming in below our budget by about a thousand dollars.


 o
RE: Contractor costs?

wow, i realize this is 4 years later, but for a full and 3/4 bath remodel our quotes are around $23,000. And that's not counting vanity, toilet, tile or grout materials. makes me wonder. we're in massachusetts though. maybe labor is more expensive?


 o Post a Follow-Up

Please Note: Only registered members are able to post messages to this forum.

    If you are a member, please log in.

    If you aren't yet a member, join now!


Return to the Bathrooms Forum

Information about Posting

  • You must be logged in to post a message. Once you are logged in, a posting window will appear at the bottom of the messages. If you are not a member, please register for an account.
  • Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review your post, make changes and upload photos.
  • After posting your message, you may need to refresh the forum page in order to see it.
  • Before posting copyrighted material, please read about Copyright and Fair Use.
  • We have a strict no-advertising policy!
  • If you would like to practice posting or uploading photos, please visit our Test forum.
  • If you need assistance, please Contact Us and we will be happy to help.


Learn more about in-text links on this page here