|
Wed, Oct 12, 11 at 10:50
| I have a typical set of steps running down to my basement. At the base is a 2x4 nailed to the side of the steps and into a rafter above. A rail is mounted in two upper locations and to the 2x4 at the base. I want to remove the 2x4 and put a post in at the base of the stairs. The question is how to best attach the post to the steps.
First the post is Hemlock...should I put a piece of the blue stuff you put under pt lumber under the post? Second, do I drill through the front of the post, through it then through the bottom stair and attach with two lag bolts then fill the holes with a plug OR use some other sort of screw...I see on there's a newel screw that appears to be wood threaded at one end (newel) and lag threaded at the other. Is this strong enough? Forgive my poor teminolgy.
|
Follow-Up Postings:
Please Note: Only registered members are able to post messages to this forum. If you are a member, please log in. If you aren't yet a member, join now!
Return to the Basements Forum
Instructions
- You must be a registered member and logged in to post messages on our forums.
- Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review the contents and make changes.
- After posting your message, you may need to refresh the forum page in order to see it.
- It is illegal to post copyrighted material without the owner's consent.
- HTML codes are allowed in the message field only.
- No advertising is allowed in any of the forums.
- If you would like to practice posting or uploading photos, please visit our Test forum.
- If you need assistance, please Contact Us and we will be happy to help.