Sat, Oct 14, 06 at 0:18
| Hi. I'm finishing my basement now. we got the permit. finished framing, wiring, lighting, and insulation. waiting for the 2nd inspection. Then i will put the drywall up and ceiling. I'm not planning to do the flooring right now. Its concrete right now. Will there be a problem in issuing the Certificate of Occupancy ?
Thanks in advance for replying. |
Follow-Up Postings:
|
- Posted by newhomebuilder (My Page) on Sat, Oct 14, 06 at 20:15
| Not sure where you live, but in my area there would be no problem getting your CO. A basement is not considered to be square footage that has to be finished before occupancy. |
|
- Posted by maverick9001 (My Page) on Sun, Oct 15, 06 at 11:10
| Thanks for the reply. I live in NJ |
|
- Posted by newhomebuilder (My Page) on Mon, Oct 16, 06 at 9:07
| We are in TN and the code is pretty strict here. |
|
| Only your town code official can answer that question. |
Please Note: Only registered members are able to post messages to this forum. If you are a member, please log in. If you aren't yet a member, join now!
Return to the Basements Forum
Instructions
- You must be a registered member and logged in to post messages on our forums.
- Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review the contents and make changes.
- After posting your message, you may need to refresh the forum page in order to see it.
- It is illegal to post copyrighted material without the owner's consent.
- HTML codes are allowed in the message field only.
- No advertising is allowed in any of the forums.
- If you would like to practice posting or uploading photos, please visit our Test forum.
- If you need assistance, please Contact Us and we will be happy to help.