Return to the Basements Forum | Post a Follow-Up

 o
Basement Doors and Jambs

Posted by lexar (My Page) on
Sat, Mar 6, 10 at 19:58

Hi,

I am finishing my basement and my floor will be about 7/8" thick.
What is the best and fastest way to install the door jambs?

Directly on the concrete and then cut away 7/8" from the bottom when installing the floor?
Install the door Jambs 7/8" higher off the concrete floor right away?


Follow-Up Postings:

 o
RE: Basement Doors and Jambs

Floors, then doors is the best sequence.


 o
RE: Basement Doors and Jambs

Yes that would be good but the floor is delayed and I don't want to waste time waiting for it.


 o
RE: Basement Doors and Jambs

Then put a piece of 3/4 PT board under each one and install them. Later, whoever installs the floors will trim the bottom of each jamb to get a snug look/fit..


 o Post a Follow-Up

Please Note: Only registered members are able to post messages to this forum.

    If you are a member, please log in.

    If you aren't yet a member, join now!


Return to the Basements Forum

Information about Posting

  • You must be logged in to post a message. Once you are logged in, a posting window will appear at the bottom of the messages. If you are not a member, please register for an account.
  • Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review your post, make changes and upload photos.
  • After posting your message, you may need to refresh the forum page in order to see it.
  • Before posting copyrighted material, please read about Copyright and Fair Use.
  • We have a strict no-advertising policy!
  • If you would like to practice posting or uploading photos, please visit our Test forum.
  • If you need assistance, please Contact Us and we will be happy to help.


Learn more about in-text links on this page here