|
Thu, Mar 29, 12 at 11:23
| All,
I have a 12 x 12 inch hole in the unfinished part of my basement. I do not think this is a rough in as there is no pipe in the hole. If I dig down another 6" or so and don't find any pipe, is it okay for me to fill this hole? It is a nuisance in my work room and I want to close it off from termites ect. Thoughts? I was thinking of just pouring concrete in it. Thanks! Chris |
Follow-Up Postings:
|
| Might it be at the low point in the floor, intended for a sump pump? |
Please Note: Only registered members are able to post messages to this forum. If you are a member, please log in. If you aren't yet a member, join now!
Return to the Basements Forum
Instructions
- You must be a registered member and logged in to post messages on our forums.
- Posting is a two-step process. Once you have composed your message, you will be taken to the preview page. You will then have a chance to review the contents and make changes.
- After posting your message, you may need to refresh the forum page in order to see it.
- It is illegal to post copyrighted material without the owner's consent.
- HTML codes are allowed in the message field only.
- No advertising is allowed in any of the forums.
- If you would like to practice posting or uploading photos, please visit our Test forum.
- If you need assistance, please Contact Us and we will be happy to help.