$$$ What are your thoughts on this change order

winesnobMarch 8, 2012

Pricing for extra work

1. Install 16 new can lights thru out bedroom and bathroom

2. Move fan in bedroom to new location and patch drywall

3. Move fan in bathroom and patch

4. Upgrade electric to a/c

5. Demo wall at water closet, move electric, frame for pocket door, install new door and frame,

patch drywall

6. Remove existing doors at closets and entry to bedroom, install new 1-3/4" solid core doors,

install casing

7. Add to cost -painting of 1door

8. Install hardware on doors (hardware not included)

--~

Cost of changes $6,380

Thank you for reporting this comment. Undo
PRO
Sophie Wheeler

You've got a mix of jobs there that 100% absolutely should involve a licensed electrician. If this is for a handyman to do all of these jobs, then you aren't getting your money's worth. If you are using a real electrician for the electrical jobs, then the pricing is pretty spot on. You've got at least 3-4K worth of electrical on the list, and the other 2K is fussy PIA smaller "premium" jobs.

    Bookmark   March 8, 2012 at 7:37PM
Thank you for reporting this comment. Undo
winesnob

Licensed contractor, thanks sometime we just want a little reassurance.

    Bookmark   March 8, 2012 at 9:14PM
Thank you for reporting this comment. Undo
energy_rater_la

do yourself a favor and make sure that your
new recessed lights are insulation contact air tight
lights.

otherwise attic temps & insulation particles will
have entry into your home.

the recessed lights should have no holes in the
housing..ICAT. recessed lights that are not air tight
have holes in the housing.

the upcharge is minimal to purchase by the contractor's
pack. to retrofit IC to air tight later is about
$15 per light.

Ideally keep attic temps in the attic, rather than
adding to home's heating & cooling loads.

best of luck.

    Bookmark   March 10, 2012 at 9:20PM
Sign Up to comment
More Discussions
Small bath remodel - problem tub size
I could use some advice. We decided it is high time...
thomis
4" or 5" rounded newell posts--where to order?
Is there such a thing as a 4" or 5" round...
bisondaktelcom
Kitchen cabinet rankings- middle of the line
We are redoing my kitchen. It is 11x13. I saw a ranking...
Jessica Galvin
Questions about attic & insulation
1980's era house. Blown in FG insulation which at this...
lucas_tx_gw
? remove wood siding b4 replacing with vinyl
I plan on having my 1950 split level resided in the...
abbey_cny
Sponsored Products
Safavieh Handmade Ancestry Ivory/ Red Wool Rug (5' x 8')
Overstock.com
Premium Select Brushed Steel 54-Inch Ceiling Fan with Appliance White
$518.00 | Bellacor
Hand-loomed Loft Stones Purple Rug (3'6 x 5'6)
Overstock.com
Juli Opal Glossy Satin Nickel Mini Pendant
$216.00 | Bellacor
Designers Fountain 98003 Stratton 3 Light Bath Bar - 98003-SP
$105.50 | Hayneedle
Modern Indoor/Outdoor Area Rug: Tayse Rugs Rugs Festival Multi 7 ft. 10 in. x
Home Depot
Kichler Stafford Traditional Chandelier
1800Lighting
CAL Lighting Lamps 5-Light 76 in. Brushed Steel Arc Floor Lamp with Metal Shade
Home Depot
People viewed this after searching for:
© 2015 Houzz Inc. Houzz® The new way to design your home™