Our First Quote

albertcatMarch 5, 2011

Okay. So we have our first quote on our pool. Of course, we have no idea if this is a fair price. Would love your opinion. It's for a 95 perimeter pool with a spa.

Depth: 3 x 5 x 4

473 square feet 94 perimeter

*spa square footage and perimeter not included in above numbers*

Steel reinforcing (#3, #4 rebar)

Gunite Pool Shell 6 sacks to the cubic yard

Coping - Flagstone

6" Standard Tile -

Spa Premium 6 jets Level with blower

Hand-troweled plaster � White or Smoke

552 sq ft Salt Concrete Decking

Deluxe lights - 100w (spa), 500w (pool)

Ground fault interrupter(s) as required (GFI)

Freeze sensor

400,000 BTU Gas Heater

Filter(s)- 520 sq ft Cartridge

Pumps � Petair Variable Speed SVRS

Drains � safety pool drain

Automatic cleaner � Platinum Legend w/booster pump

Automatic pool skimmers

Adjustable return inlets

Test kit, leaf skimmer, thermometer, pole and brush

Overflow

Raised Wall with Stone Veneer

Sun Touch Wireless Remote

Tablet Feeder

Tanning Ledge with Bubbler

2 stone water scuppers

$38,229

Thank you for reporting this comment. Undo
mjem11

What area are you building in "STATE"

    Bookmark   March 5, 2011 at 12:06PM
Thank you for reporting this comment. Undo
poolguynj

SunTouch is the wrong controller. Should be an EasyTouch.

Freeze protection with Pentair is user controllable WRT to what gets turned on at the designated activation temp. It's not like you're getting something additional that you would have to pay for.

I have never heard of gunite measured that way. How thick the walls, floor and bond beam, and the compressive strength are normally how it's quoted. Gunite usually comes from a conveyor type truck, not bagged product.

Rebar info needs to be more specific. Spacing and bond beam reinforcement pattern are often specified.

Consider using LED lights. They are a bit more money but well worth it. 500W/100W incandescents aren't "Deluxe".

How many returns, plumbing sizes, and type of pipe should be specified.

How big is the spa?

How big is the tanning ledge?

"Safety" drains, when used, are a requirement for their use.

Scott

    Bookmark   March 5, 2011 at 3:07PM
Thank you for reporting this comment. Undo
renovxpt

That is a really low price.

    Bookmark   March 5, 2011 at 6:13PM
Thank you for reporting this comment. Undo
albertcat

Scott, thanks for the feedback - This is a list of questions I am sending to the builder. I THINK this should answer most of our questions -

EXCAVATION

What is the "rock time" cost?
Is any rock time included in the bid?
When do you start billing for "rock time"

GRAVEL SUPPORT
Do you include a "gravel support" under the entire pool structure?
If so, what is the diameter and minimum layer?

STEEL
What size is the pool steel?
Do you use #3 or #4 bars for the pool construction?
Do you use #3 or #4 on the pool floor?
What is the spacing and bond beam reinforcement pattern?

PLUMBING
Do you use PVC?
What size of return lines from pump to the pool.
How many skimmers?
Are you skimmers plumbed with equalizer lines that run separately back to the filter pump?
How many return inlets do you install around the pool?
Do you run a separate and dedicated main drain line back to filer?
Do you provide an overflow with grate for constant water level?
Do you provide a water leveler?

SHOTCRETE/GUNITE
What standard mix do you use for gunite or shotcrete?
How thick are the walls, floor, and bond beam?
What is the compressive strength?
What is the size of the pool beam?
What is the thickness of cove areas of the pool?

TILE
How wide is your band of tile around the pool?

MASONRY
How wide is your coping stone?

LIGHTING
Do you install a PVC underground conduit from the niches to the junction boxes?
Does the light have a "low water shut-off" protector?

DECKING
How thick is the decking?
What is the PSI at 28 days strength?
What steel do you use?
Are they placed 16" on center way? If not, what are they placed?
What do you use as Control Joints"/

PLASTER
What is your plaster finish?

POOL/SPA
What is the size of the spa?
What is the size of the tanning ledge?

START-UP
Do you include any start up such as the following:
�Balancing of the water chemistry
�Personal instruction on operation of pool equipment and water chemistry
�Custom instruction manual on the operation of the pool
�Any days of plaster brushing with special acid startup to reduce plastic mottling during the break-in period

    Bookmark   March 5, 2011 at 8:49PM
Sign Up to comment
More Discussions
changing pool filter
I AM TOLD BY MY POOL SERVICE THAT MY FILTER IS TOO...
rudnick
New Pool in Louisiana
Wanted to share a few pictures of our new pool. It...
trhought
should pool building take this long??
I signed a contract July 19th with Mr. Carlos pools....
animallover5
hot tub evaporation rate in cold
Ok, newbie here to pool and hot tub ownership. We have...
ladybugfruit
Need advice on 48 refrigerator remodeling my kitchen
What 48 refrigerator built in looks and performs best...
mercedes316
People viewed this after searching for:
© 2015 Houzz Inc. Houzz® The new way to design your home™