Pool Plumbing

william77June 17, 2009

We installed all of the 2.5"PVC pipe/plumbing and discovered that we had not used enough glue; hence, we discovered a number of leaks that we have since repaired/replaced the fittings/joints. The system is currently holding 60 psi of static air pressure. Do we have anything to worry about in the future? Should we tear out all of the pipe and replace all joints? If it is holding pressure currently will the system be safe to cover and proceed?

Thank you for reporting this comment. Undo
fletch58

I am not a plumber but if it works now, thats all you need to worry about I would think

    Bookmark   June 18, 2009 at 3:43PM
Sign Up to comment
More Discussions
Pool Filter Question
Should my pool filter run 24/7 or less than that? I...
JeremyLin
Plaster mottling???
It's been 13 days since we had the pool replastered....
lisadlu
Pool builder search sugar land, tx
Hi guys! Were closing on our brand new home in sugar...
mtrade01
Concerns about quartzscape plaster on new build
Yea, our newly constructed pool was plastered with...
spicegal
Is it safe to build a vinyl inground with pyrite in the soil?
I have been trying to find information about excavating...
jo229
© 2015 Houzz Inc. Houzz® The new way to design your home™