What post-start decisions took the longest for you to make?

dbrad_gwSeptember 21, 2012

We have our basic floorplan settled, and are still trying to decide what style we want the exterior to be. But we'll decide that soon, so we are roughly a year out from starting our build.

We are also both quite OCD though, and I have a deep seated need to thoroughly research all alternatives when faced with a decision. So as a result I want to get as many difficult decisions as we can out of the way now.

Which decisions - among those that you had to make *after* your build started - were the toughest and took the most time and effort to make?

I'm thinking along the lines of trim styles, appliance choices, etc, but maybe I'm way off here and there are things I wouldn't even think of until they hit us and we have to decide quickly. I hating being forced into decisions where I don't have time to properly research all alternatives, so thus my question...

Thanks!

Thank you for reporting this comment. Undo
bevangel_i_h8_h0uzz

Hardest and most time consuming for me was picking out all my light fixtures and plumbing fixtures... but mostly that was because I was trying desperately to find things I liked at the lowest possible prices.

I knew what I LIKED and had already picked out almost everything before we ever signed our contract with builder. But by the time we actually started buying lighting and faucets, our budget had taken a severe beating due to a host of issues with our builder. Some very very judicious on-line shopping allowed me to find alternatives at substantial savings that I liked just as well or better than my original choices. But I probably spent a couple of hundred hours looking. By that point, I had taken over GCing our build so I KNEW when I would need to have various items on-site and never got hit with any "make a decision by tomorrow" kinds of things.

    Bookmark   September 21, 2012 at 5:23PM
Thank you for reporting this comment. Undo
virgilcarter

Your floor plan and your exterior design are as linked together as your floor plan and your furniture arrangements. They are not seperate issues, they are one consolidated consideration. In many cases, they all require study and adjustment so that exterior, functional locations and adjacencies and furniture/life-style considerations are all working together satisfactorily for you. I hope this is the case with your "settled" floor plan.

As for challenging post-start decisions, these often include areas where the builder may have provided "allowances" for owner selection. These usually include paint and finish materials (cabinets, counter tops, etc.), appliances, plumbing and lighting fixtures, and the like.

If I were you, I'd begin to develop my preferences for these selections, balancing personal choice with expense. Starting early, as you are, will save worry and hassle and let you enjoy the process. This site and Houzz are good sources of information and experience to draw from. Start a file for each area of consideration and stuff it with your idea examples, sources and prices! Good luck!

    Bookmark   September 23, 2012 at 9:14AM
Sign Up to comment
More Discussions
Need help with 8' porch drop-off
I'm needing ideas for terracing steps from my front...
Beth LaPenna
Sending my floor plan modifications to the architect. Ideas?
I have to have all my structural changes decided by...
houserookie
Dark hardwood vs lighter hardwood floors
I'm trying to decide which type of floors we should...
houserookie
help, is main gable too flat/not enough dimension?
last chance to change it. Will this front elevation...
msmith110705
Inexpensive "build on your lot" builders?
I've been researching local builders online and came...
olivesmom
People viewed this after searching for:
© 2015 Houzz Inc. Houzz® The new way to design your home™