We are about a month into our build from the point that the first shovel hit the ground. The framing is about 4 days from being complete (including the roof). I'm shocked by how quickly things have gone. My husband and I have had several conversations about how fast the process has been and both of us are often left wondering...if the structure can go up in three weeks what are the other 5 to 6 months for?

So, to satisfy our curiosity, what part of your build has taken the longest and were you surprised by the delay/amount of time it took to complete or was it expected?

Thank you for reporting this comment. Undo
melaska

Well, to be honest...saving the money to build :) We are going to be 'out of pocket' so it will get done most likely over an 18-24 month period. I'm doubling what hubby says so I got that covered ;)

We put in the foundation last Fall...just now starting the floor framing.

Shelling in seems to go fast - from what I understand...it's the finish work inside that takes so much time. We are building very simply & according to our severe weather conditions in snow city, Alaska.

We spent a little extra to beef up the foundation since we live in a very active earthquake zone (Old Valdez was destroyed in the '64 Good Friday Earthquake).

Good luck in your build! :)

    Bookmark   June 21, 2012 at 8:40PM
Thank you for reporting this comment. Undo
galore2112

The reason why framing is up so quickly is that it's done by one trade, right after the foundation is ready.

The rest of the house requires many different trades with different schedules. If those trades were scheduled perfectly, you could build a typical house in a weekend (see Extreme Home Makeover).

    Bookmark   June 21, 2012 at 8:52PM
Thank you for reporting this comment. Undo
auroraborelis

jrldh - if only I could get Extreme Home Makeover over to my house... Only I'm not that interesting...

What is the typical start to finish timeframe for most people?

    Bookmark   June 21, 2012 at 9:21PM
Thank you for reporting this comment. Undo
alexcato

In our case, foundation and framing was from Halloween to the week before Christmas, when the roof was finished.
What took a long time was the phase immediately after (electrical, plumbing, HVAC, network). We also took a long time (almost a month) to get a pretty complex brick facade. After the drywall went up, things accelerated again, but slowed down again for millwork and interior carpentry. We are now looking at a finish around late August/early September for 4000 sqf.

    Bookmark   June 22, 2012 at 1:24AM
Thank you for reporting this comment. Undo
Annie Deighnaugh

Interior work always takes longer...there's a lot to it...different trades, different materials, critical dependencies in the timeline including inspections...and it will take longer if you make changes.

    Bookmark   June 25, 2012 at 10:17AM
Sign Up to comment
More Discussions
Master bath/closet suggestions
My wife and I are planning on building a house. We...
stancial
homeowner's association
totally OT, but... would you, did you, or will you be...
energy_rater_la
Looking at houses in my hometown today
So today I went to my hometown and drove around looking...
mrspete
Desireable slope for drainage away from house and garage?
We're building a rectangular-ish house with an attached...
lookintomyeyes83
Master Bath Layout Help
Hi, I have decided to get rid of the freestanding tub....
noworries22
Sponsored Products
Area Rug: Fairfield Life Style Collection Brown 5' x 7' 6"
Home Depot
Milan Leather Chair
| Italy Design
Rose Circle Rings Giclee Glow Plug-In Swag Pendant
Lamps Plus
Blue Canvas Wall Art
$129.99 | zulily
2-Day Designs 18-inch Pine Lazy Susan
Overstock.com
Purple Red Green Dragonfly Style Tiffany Floor Lamp
ParrotUncle
Symphony Flush Mount Ceiling Light
$193.00 | Bellacor
Purdue University Brushed Nickel Floor Lamp
Lamps Plus
People viewed this after searching for:
© 2015 Houzz Inc. Houzz® The new way to design your home™