curing of walls

builderswifeAugust 10, 2006

I have kind of a dumb question. How long do the walls need to cure after pouring? What determins the length of time? I really don't want to wait a month before the trusses can be set. Thanks in advance.

Thank you for reporting this comment. Undo
bus_driver

Cure for what purpose? Building can begin within a few days, but the moisture cure needs to be insured for at least 30 days. The concrete grows stronger each day during the curing process UNLESS it dries out. Once it is dried out, it NEVER again increases in strength.

    Bookmark   August 10, 2006 at 6:10PM
Sign Up to comment
More Discussions
Walk-out basement design
Building a house in western Massachusetts -- it will...
Artemis_MA
Which drywall to use in the basement?
Hi, I am finishing a basement that is under the attached...
Vesh
Mysterious Concrete Box in Basement
I am considering placing an offer on a house (built...
charv
Replacing Steel Column With Stud Wall?
I am interested in replacing a steel column with a...
atv_freak
Flooring System over a basement
In my current house we used 16-18" deep floor...
AZN8TIV
© 2015 Houzz Inc. Houzz® The new way to design your home™